Main features of the Nam Theun 2 hydroelectric project (Lao PDR) and the associated environmental monitoring programmes
Основные характеристики гидроэнергетического проекта Nam Theun 2 (Лаосская НДР) и соответствующих программ экологического мониторинга
2014-10-30
SCID: 54.1/cez47fs3
Discuss with AI
3D numerical modelNam Theun 2 hydroelectric projectenvironmental monitoringgreenhouse gas emissionsreservoir water quality
Figures from the paper
Abstract (AI)
The Nam Theun 2 hydroelectric Project is located in Lao PDR on the Nam Theun River. The reservoir impoundment started in April 2008 and hydropower generation began in March 2010. The reservoir has a total volume of 3.9 billion m3, covering an area of 489 km2 at full supply level and 86 km2 at the minimum operating level. The performance is 1070 MW and the annual production is 6 TWh. The reservoir is operated seasonally by storing water during the wet season. A system of tunnels and channels diverts the waters from the Nam Theun watershed to the Xe Bangfai watershed. An ambitious environmental monitoring programme of project sites was launched by EDF - NTPC in 2008 and remains operational. An on-site laboratory was established to ensure sampling and analysis in real time. The compartments studied are water quality, greenhouse gas emissions, phytoplankton, zooplankton, benthic macroinvertebrates and fish. A 3D numerical model was developed based on monitoring data to predict the long-term changes in water quality and greenhouse gas production of the reservoir. Additional research programmes have been launched to understand bio-chemical dynamics and processes.
Key Findings
1
A tunnel-and-channel system diverts water from the Nam Theun watershed to the Xe Bangfai watershed.
2
An on-site laboratory enables real-time sampling and analysis, while a 3D numerical model predicts long-term reservoir water-quality and greenhouse-gas changes.
3
Its reservoir stores 3.9 billion m3, spans 489 km2 at full supply level, and operates seasonally by retaining wet-season water.
4
Since 2008, an extensive environmental monitoring programme has assessed water quality, greenhouse gases, plankton, benthic macroinvertebrates, and fish.
5
The Nam Theun 2 hydropower project began generation in March 2010 with 1070 MW capacity and annual production of 6 TWh.
Research Object
The Nam Theun 2 hydroelectric project and its reservoir in Lao PDR
Research Subject
The project's environmental impacts and associated water-quality, greenhouse-gas, and aquatic-ecosystem dynamics monitored and modeled over the long term
Publication Details
Publication Date
2014-10-30
Journal
Publisher
ISSN
Open access PDF
Access Type
Author Information
Download PDF
Subscribe to digest