Research on missing value prediction of measured ERT data for coal mine based on a GRNN algorithm
Исследование прогнозирования пропущенных значений измеренных данных ЭРТ для угольной шахты на основе алгоритма GRNN
2026-01-13
SCID: 54.1/d555rbfr
Discuss with AI
electrical resistivity tomographyelectrode disconnectiongeneral regression neural networkmean value interpolationmissing value prediction
Figures from the paper
Abstract (AI)
In the process of long-term monitoring of the coal seam floor of a coal mining face using electrical resistivity tomography (ERT), the data loss caused by electrode disconnection adversely affects early warning of water inrush and prevents the identification of hidden dangers, hindering safe production. Due to the particularity of the monitored environment, the maintenance of offline electrodes may not be timely. Therefore, how to deal with the loss of measured data caused by electrode disconnection has become a problem that must be solved in the long-term monitoring process. In this paper, we analyze the effect of electrode disconnection on the measured data. Then, the principle of the general regression neural network (GRNN) algorithm is introduced. The missing values in the measured data are predicted using the GRNN algorithm. The results of verification experiments conducted in a water tank show that when the original data integrity is 82.96%, the predicted data accuracy reaches 91.46%, and when the original data integrity is only 55.56%, the predicted data accuracy still reaches 82.45%. Finally, actual applications of the proposed method are carried out on coal mining faces. A set of data with an integrity of 73.8% is predicted. Compared with the measured data when all the electrodes are online, the accuracy of the predicted data is 85.18%. The accuracy of the data predicted using the proposed method is 14.99% higher than that of the data predicted using the commonly used mean value interpolation method.
Key Findings
1
A general regression neural network (GRNN) algorithm can predict missing measured ERT data caused by electrode disconnection.
2
Electrode disconnection during long-term ERT monitoring causes significant data loss that impairs early warning of water inrush in coal mines.
3
GRNN prediction accuracy is 14.99% higher than commonly used mean value interpolation for missing ERT data.
4
In field application on a coal mining face: predicting a dataset with 73.8% integrity produced 85.18% accuracy compared to fully online-electrode measurements.
5
In water-tank verification: with original data integrity 55.56%, GRNN-predicted data accuracy remained 82.45%.
6
In water-tank verification: with original data integrity 82.96%, GRNN-predicted data accuracy reached 91.46%.
Research Object
Measured electrical resistivity tomography (ERT) data from coal mine seam-floor monitoring (with missing values due to electrode disconnection)
Research Subject
Prediction/reconstruction of missing ERT measurements caused by electrode disconnection using a general regression neural network (GRNN) algorithm and evaluation of prediction accuracy versus baseline interpolation
Publication Details
Publication Date
2026-01-13
Journal
Publisher
ISSN
Cited by
0
Open access PDF
Access Type
Author Information
Download PDF
Subscribe to digest