Design and implementation strategy of information construction management system based on internet of things technology and AI algorithm in oil and gas pipeline construction

Стратегия проектирования и внедрения информационной системы управления строительством на основе технологии Интернета вещей и алгоритмов искусственного интеллекта при строительстве нефтегазовых трубопроводов
Huanjie Wei, Tongyu Wu, Jian Sun, Baozhu Zhang, Weiliang Wang
2026-07-01

IoT-enabled construction managementcloud-edge perception systemlightweight visual detection algorithmoil and gas pipeline constructionparticle swarm optimization
Abstract In view of challenges such as information lag and regulatory blind spots caused by the long oil and gas pipeline construction front, this study proposes an information construction management system that integrates the internet of things and artificial intelligence. The research mainly builds a cloud-edge multi-source perception system, and introduces a lightweight visual detection algorithm with a depth-separable residual module and a reconstructed complete intersection-union ratio loss function. A multi-factor fuzzy comprehensive evaluation and an improved particle swarm optimization (PSO) algorithm are integrated to build a dynamic optimization model for trench support parameters. The results showed that the average accuracy of the lightweight algorithm was 71.6%. The improved PSO algorithm reduced the support cost to 3340 yuan m −1 . Six months after implementing the system, the on-site illegal operation capture rate increased to 96.8%, the one-time welding pass rate reached 98.2%, the hidden danger response time decreased to 4.2 min, the rework rate was 1.1%, and the comprehensive management cost was saved by 28.6%. The information-based construction management system can support reliable engineering risk warning and parameter optimization, and provides a reliable implementation plan for the safety management and control, quality improvement, cost reduction and efficiency improvement of modern smart oil and gas pipeline networks.
1
A lightweight visual detection algorithm with depth-separable residual modules and reconstructed IoU loss achieved 71.6% average accuracy.
2
After six months, illegal-operation detection reached 96.8%, welding pass rate reached 98.2%, and hazard response time fell to 4.2 minutes.
3
Multi-factor fuzzy evaluation and improved particle swarm optimization reduced trench-support costs to 3340 yuan m−1.
4
System implementation reduced rework to 1.1% and comprehensive management costs by 28.6%, supporting risk warning, quality improvement, and efficiency gains.
5
The study develops an IoT- and AI-integrated construction management system using cloud-edge multi-source perception for oil and gas pipelines.

information-based construction management system for oil and gas pipeline construction

the system’s effectiveness in engineering risk warning, illegal-operation detection, welding quality, trench-support parameter optimization, and construction safety, cost, and efficiency management

Publication Details
Publication Date
2026-07-01
Journal
Publisher
ISSN
Cited by
0
Access Type
Author Information
Authors
Huanjie Wei
Tongyu Wu
Jian Sun
Baozhu Zhang
Weiliang Wang
Explore further
Open the scid.ai AI chat with a ready-made request: it will find papers on a similar topic and help build a literature review.
Find similar papers in the chat →
Make a presentation
100%