The role of ISO 31000 risk management in enhancing HSE and project performance: evidence from oil and gas construction projects

Роль управления рисками в соответствии с ISO 31000 в повышении показателей ОЗОС и эффективности проектов: данные по строительным проектам в нефтегазовой отрасли
Maria Istiqoma, Abraham Lomi, Lies Kurniawati Wulandari, Hani Zulfia Zahro’, Maranatha Wijayaningtyas
2026-09-08

HSE performanceISO 31000 risk managementPLS-SEMoil and gas pipeline projectsproject performance
Using a survey, 152 professionals involved in Indonesian oil and gas pipeline projects were approached to examine how different elements of ISO 31000 risk management (Context and Criteria (IC), Identify and Analyse (IA), Evaluate and Treat (ET), and Communication (CM)) affect both Health, Safety, and Environment (HSE) performance and overall project outcomes. The data analysis was conducted using Partial Least Squares Structural Equation Modelling (PLS-SEM). The results show that Context and Criteria have a strong positive influence on HSE performance (β = 0.55, p < 0.001), as well as project performance (β = 0.90, p < 0.001). Evaluate and Treat also significantly boosts HSE (β = 0.65, p < 0.001). In contrast, Identify and Analyse, Communication, and even HSE performance do not appear to have a significant direct impact on project outcomes. The model accounts for a substantial proportion of the variance in both HSE (R²_HP = 0.64) and project performance (R²_PP = 0.71). Early-stage risk contextualisation and active risk treatment are far more influential than merely identifying or communicating risks, especially in the high-risk setting of oil and gas construction. For project owners, contractors, and regulators, the lesson is clear: prioritise early risk framing, allocate concrete resources for treatment, and incorporate risk criteria into contracts to achieve better safety and more reliable project delivery.
1
Context and Criteria strongly improve both HSE performance (β = 0.55, p < 0.001) and project performance (β = 0.90, p < 0.001).
2
Early risk contextualisation and concrete risk treatment are more influential than risk identification or communication for improving outcomes.
3
Evaluate and Treat significantly enhances HSE performance (β = 0.65, p < 0.001) in Indonesian oil and gas pipeline projects.
4
Identify and Analyse, Communication, and HSE performance show no significant direct effects on overall project outcomes.
5
The PLS-SEM model explains substantial variance in HSE performance (R² = 0.64) and project performance (R² = 0.71).

Indonesian oil and gas pipeline construction projects

The effects of ISO 31000 risk-management elements on HSE performance and overall project performance

Publication Details
Publication Date
2026-09-08
Journal
Publisher
ISSN
Access Type
Author Information
Authors
Maria Istiqoma
Abraham Lomi
Lies Kurniawati Wulandari
Hani Zulfia Zahro’
Maranatha Wijayaningtyas
Explore further
Open the scid.ai AI chat with a ready-made request: it will find papers on a similar topic and help build a literature review.
Find similar papers in the chat →
Make a presentation
100%