Waste Management during the Production Drilling Stage in the Oil and Gas Sector: A Feasibility Study
Управление отходами при эксплуатационном бурении в нефтегазовом секторе: технико-экономическое обоснование
2024-02-05
SCID: 54.1/dtbbjrs7
Discuss with AI
Khanty-Mansi Autonomous OkrugMCDMCVconversion of drilling waste into construction materialsdrilling-waste managementecological damage preventedfeasibility studynet present value (NPV)sensitivity analysis
Figures from the paper
Abstract (AI)
Drilling-waste management is of great importance in the oil and gas industry due to the substantial volume of multi-component waste generated during the production process. Improper waste handling can pose serious environmental risks, including soil and water contamination and the release of harmful chemicals. Failure to properly manage waste can result in large fines and legal consequences, as well as damage to corporate reputation. Proper drilling-waste management is essential to mitigate these risks and ensure the sustainable and responsible operation of oil and gas projects. It involves the use of advanced technologies and best practices to treat and utilize drilling waste in an environmentally safe and cost-effective manner. This article describes a feasibility study of four drilling-waste management options in the context of the Khanty-Mansi Autonomous Okrug of Russia. For ten years of the project life, the NPV under the base scenario is equal to RUB −3374.3 million, under the first scenario is equal to RUB −1466.7 million, under the second scenario is equal to RUB −1666.8 million and under the third scenario is equal to RUB −792.4 million. When considering projects, regardless of oil production, the project under the third scenario pays off in 7.8 years and the NPV is RUB 7.04 million. The MCD and MCV parameters were calculated to be 106 km and 2290 tons, respectively. Furthermore, the study estimates the ecological damage prevented and the environmental effect of each option. Quantitative risk assessments, conducted through sensitivity analysis, reveal that the fourth option, involving the conversion of drilling waste into construction materials, emerges as the most economically feasible. The study also evaluates the interaction between business and government and analyzes the current situation in the sphere of drilling-waste management, concluding with concise recommendations for both companies and official bodies.
Key Findings
1
A ten-year feasibility study compared four drilling-waste management options for Khanty-Mansi Autonomous Okrug, Russia.
2
Base-scenario NPV over ten years is RUB −3374.3 million; scenario 1 NPV is RUB −1466.7 million; scenario 2 NPV is RUB −1666.8 million; scenario 3 NPV is RUB −792.4 million.
3
If considered regardless of oil production, the project under scenario 3 pays off in 7.8 years and yields NPV RUB 7.04 million.
4
MCD (maximum credible distance) and MCV (maximum credible volume) were calculated as 106 km and 2290 tons, respectively.
5
Sensitivity analysis and quantitative risk assessment identify option 4 (conversion of drilling waste into construction materials) as the most economically feasible.
6
The study estimates ecological damage prevented and environmental effects for each option and provides recommendations for companies and authorities.
Research Object
Drilling-waste management options during the production drilling stage in the oil and gas sector (including conversion to construction materials)
Research Subject
Feasibility, economic performance (NPV, payback), environmental effects and ecological damage prevented, and quantitative risk/sensitivity analysis of the drilling-waste management options
Publication Details
Publication Date
2024-02-05
Journal
Publisher
ISSN
Cited by
40
Open access PDF
Access Type
Author Information
Download PDF
Subscribe to digest