Unplanned dilution back analysis in an underground mine using numerical models

Обратный анализ незапланированного разубоживания на подземной шахте с использованием численных моделей
Diogo Peixoto Cordova, André Cezar Zingano, Ítalo Gomes Gonçalves
2022-09-19

Cavity Monitoring System (CMS)Equivalent Linear Overbreak Slough (ELOS)cable bolt lengthfinite element modelingunplanned dilution
In underground mines, stability problems can cause unplanned dilution, increasing the costs of mining operations, such as loading, transport, crushing and grinding. This is usually dealt with by simply increasing investments with support. However, the design geometry of stopes and drifts also has a great effect on a stope’s stability. The use of empirical stability methods is a very common practice, however because of their few input parameters, it cannot predict the actual performance related to each stope and drift design. This study has as main goals a back analysis of the actual dilution, using the Equivalent Linear Overbreak Slough (ELOS) method and analysis in the drift developments at the hanging wall contact, using numerical models. The case study is an underground hard rock gold mine, with a pillar-less Transversal Stope method. The hanging wall failure was quantified using a database from 19 stopes measured by the Cavity Monitoring System (CMS). Numerical finite elements models (FEM) were used, and 5 primary stopes were selected to calibrate models. The volumes of actual dilution showed a good correlation with the volumes of the relaxation zones produced by the models. Then, new optimized drift geometry layouts at the hanging wall contact were proposed, showing a decrease in 2.35 times in the relaxation zone of the numerical models, therefore justifying the use of these models as a dilution optimization tool. This methodology also proved to be useful in the definition of cable bolt length.
1
Hanging-wall failure and actual dilution were quantified from Cavity Monitoring System measurements across 19 stopes.
2
Numerical models calibrated against five primary stopes showed good correlation between actual dilution volumes and modeled relaxation-zone volumes.
3
Optimized drift geometries at the hanging-wall contact reduced modeled relaxation-zone volume by 2.35 times, supporting numerical modeling for dilution optimization.
4
The methodology also assisted in defining cable-bolt length for ground support design.
5
The study back-analyzed unplanned dilution in a pillar-less transversal-stope underground hard-rock gold mine using ELOS and finite-element numerical models.

An underground hard-rock gold mine with pillar-less transversal stopes and hanging-wall drift/stope geometries

Unplanned dilution and hanging-wall failure, including the relationship between actual dilution volumes, numerical relaxation zones, optimized drift geometry, and cable-bolt length

Publication Details
Publication Date
2022-09-19
Journal
Publisher
ISSN
Cited by
13
Access Type
Author Information
Authors
Diogo Peixoto Cordova
André Cezar Zingano
Ítalo Gomes Gonçalves
Explore further
Open the scid.ai AI chat with a ready-made request: it will find papers on a similar topic and help build a literature review.
Find similar papers in the chat →
Make a presentation
100%