Gas Lift and Electric Submersible Pump Combination used to Activate a Dead Well

Комбинация газлифта и электроцентробежного насоса для реанимации мёртвого скважины
Nestor Tsamo, Nazaire Pierre Kenmogne, Dianorré Tokoue Ngatcha, Josper Karl Mbenoun, Noel Nyang Kibanya, Lazarre Kamdem
2024-06-30

decline curve methodselectric submersible pump (ESP)gas liftnodal analysisrotating gas separator
The well-called KD-2 (for confidential reasons) is not producing because the bottom hole pressure of the well is greater than the reservoir pressure. The purpose of this paper is to activate the well KD-2 by the gas lift and electric submersible pump (ESP) with a rotating gas separator combination in order to increase its production. The completion and the pressure, volume, and temperature (PVT) data are processed under Pipesim and by integrating a certain number of calculations by the nodal analysis and the decline curve methods. The results obtained show that well KD-2 activated by the gas lift provides a flow rate of 3038.019 STB/day. In order to increase the flow rate of well KD-2 activated by the gas lift, the ESP with rotating gas separator is added and the flow rate becomes 4845.325 STB/day which represents a gain of 59.48% in flow rate. In addition, the gas lift and ESP with rotating gas separator combination guarantees an eight-year operating period for a probability of $ 3,601,197 with a return on investment of 2 months. The gas lift and ESP with rotating gas separator gas combination can be used to optimize the production of low-flow wells in the same geographical areas and to consider the reactivation of dead wells.
1
Adding an electric submersible pump (ESP) with a rotating gas separator increased KD-2 flow to 4845.325 STB/day.
2
The ESP plus rotating gas separator increased flow rate by 59.48% compared to gas lift alone.
3
The combined gas lift and ESP with rotating gas separator method is recommended to optimize production of low-flow wells and reactivate dead wells in the same geographical areas.
4
The gas lift and ESP with rotating gas separator combination guarantees an eight-year operating period with a probability of $3,601,197 and a two-month return on investment.
5
Well KD-2 was activated by gas lift alone to produce 3038.019 STB/day.

Well KD-2 activated using a gas lift and electric submersible pump (ESP) with a rotating gas separator combination

Effect of combining gas lift and an ESP with rotating gas separator on reactivation performance: production flow rate increase, operating life, and economic return for the dead well KD-2

Publication Details
Publication Date
2024-06-30
Journal
Publisher
ISSN
Cited by
1
Access Type
Author Information
Authors
Nestor Tsamo
Nazaire Pierre Kenmogne
Dianorré Tokoue Ngatcha
Josper Karl Mbenoun
Noel Nyang Kibanya
Lazarre Kamdem
Explore further
Open the scid.ai AI chat with a ready-made request: it will find papers on a similar topic and help build a literature review.
Find similar papers in the chat
Make a presentation
100%