Gas Lift and Electric Submersible Pump Combination used to Activate a Dead Well
Комбинация газлифта и электроцентробежного насоса для реанимации мёртвого скважины
2024-06-30
SCID: 54.1/mqas58xy
Discuss with AI
decline curve methodselectric submersible pump (ESP)gas liftnodal analysisrotating gas separator
Figures from the paper
Abstract (AI)
The well-called KD-2 (for confidential reasons) is not producing because the bottom hole pressure of the well is greater than the reservoir pressure. The purpose of this paper is to activate the well KD-2 by the gas lift and electric submersible pump (ESP) with a rotating gas separator combination in order to increase its production. The completion and the pressure, volume, and temperature (PVT) data are processed under Pipesim and by integrating a certain number of calculations by the nodal analysis and the decline curve methods. The results obtained show that well KD-2 activated by the gas lift provides a flow rate of 3038.019 STB/day. In order to increase the flow rate of well KD-2 activated by the gas lift, the ESP with rotating gas separator is added and the flow rate becomes 4845.325 STB/day which represents a gain of 59.48% in flow rate. In addition, the gas lift and ESP with rotating gas separator combination guarantees an eight-year operating period for a probability of $ 3,601,197 with a return on investment of 2 months. The gas lift and ESP with rotating gas separator gas combination can be used to optimize the production of low-flow wells in the same geographical areas and to consider the reactivation of dead wells.
Key Findings
1
Adding an electric submersible pump (ESP) with a rotating gas separator increased KD-2 flow to 4845.325 STB/day.
2
The ESP plus rotating gas separator increased flow rate by 59.48% compared to gas lift alone.
3
The combined gas lift and ESP with rotating gas separator method is recommended to optimize production of low-flow wells and reactivate dead wells in the same geographical areas.
4
The gas lift and ESP with rotating gas separator combination guarantees an eight-year operating period with a probability of $3,601,197 and a two-month return on investment.
5
Well KD-2 was activated by gas lift alone to produce 3038.019 STB/day.
Research Object
Well KD-2 activated using a gas lift and electric submersible pump (ESP) with a rotating gas separator combination
Research Subject
Effect of combining gas lift and an ESP with rotating gas separator on reactivation performance: production flow rate increase, operating life, and economic return for the dead well KD-2
Publication Details
Publication Date
2024-06-30
Journal
Publisher
ISSN
Cited by
1
Open access PDF
Access Type
Author Information
Download PDF
Subscribe to digest
References available in scid.ai4
Hybrid Electrical-Submersible-Pump/Gas-Lift Application to Improve Heavy Oil Production: From System Design to Field Optimization2021
Activation of a non-eruptive well by using gas lift method and step-up of its productivity: sensitivity and economical analysis2022
Redesign of a Single String Packerless ESP-Gas Lift Hybrid2015
Single String Packerless ESP Gas Lift Hybrid; Optimizing Production and Minimizing Loss2010