Hybrid Electrical-Submersible-Pump/Gas-Lift Application to Improve Heavy Oil Production: From System Design to Field Optimization

Гибридное применение погружного электронасоса и газ-лифта для повышения добычи тяжёлой нефти: от проектирования системы до оптимизации в поле
Vu Le, Son Tran
2021-11-08

ESP/GLheavy-oil productionhybrid electrical-submersible-pump/gas-liftnodal analysispump-performance-curve model
Abstract The typical challenge encountered in developing heavy-oil reservoirs is inefficient wellbore lifting caused by complex multiphase flows. The literature on modeling of a hybrid artificial-lift (AL) system is relatively sparse and these works typically model the AL system on the basis of individual AL methods. This paper presents a case study of the design and optimization of a hybrid AL system to improve heavy-oil production. We systematically design and model a hybrid electrical-submersible-pump/gas-lift (ESP/GL) system to enhance wellbore lifting and production optimization. We found that the implementation of a hybrid ESP/GL system provides the flexibility to boost production and reduces production downtime. Results from the pilot test show that the production rate in hybrid mode are approximately 30% higher than in ESP-only mode. The power consumption of the hybrid mode is 3% lower in the ESP-only mode. Additionally, the average ESP service life exceeds 6 years which is better than expected in the field development plan. The pump-performance-curve model is built with corrections for density and viscosity owing to the increased water production. We observed a higher pressure drawdown with GL injection at fixed ESP frequency. The GL injection reduces the density of the fluid column above the ESP, resulting in less pressure loss across the pump, less power consumption, and potentially extended service life. The nodal analysis results suggest that the pump capacity can be considerably expanded by manipulating the GL rate instead of increasing the frequency.
1
A pump-performance-curve model includes corrections for fluid density and viscosity due to increased water production.
2
A systematically designed hybrid ESP/GL system increases production flexibility and reduces production downtime in heavy-oil wells.
3
Average ESP service life in the hybrid system exceeds 6 years, outperforming field development plan expectations.
4
GL injection lowers pressure loss across the pump, reduces power consumption, and can potentially extend ESP service life.
5
Gas-lift injection at fixed ESP frequency produces higher pressure drawdown and reduces fluid-column density above the ESP.
6
Hybrid mode has 3% lower power consumption compared to ESP-only mode.
7
Nodal analysis indicates pump capacity can be significantly increased by adjusting GL rate rather than increasing ESP frequency.
8
Pilot test shows hybrid mode achieves approximately 30% higher production rate than ESP-only mode.

Hybrid electrical-submersible-pump/gas-lift (ESP/GL) artificial-lift system applied to heavy-oil wells

Design, modeling, and field optimization of the hybrid ESP/GL system to improve wellbore lifting and heavy-oil production, including effects on production rate, power consumption, ESP service life, pump performance with density/viscosity corrections, pressure drawdown, and manipulation of GL rate

Publication Details
Publication Date
2021-11-08
Journal
Publisher
ISSN
Cited by
13
Access Type
Author Information
Authors
Vu Le
Son Tran
Explore further
Open the scid.ai AI chat with a ready-made request: it will find papers on a similar topic and help build a literature review.
Find similar papers in the chat
Make a presentation
100%