Factors Influencing Ore Recovery and Unplanned Dilution in Sublevel Open Stopes. Case study of Shaft No.4 at Konkola Mine, Zambia
Факторы, влияющие на извлечение руды и незапланированное разубоживание при разработке открытых очистных камер подэтажной системой: пример шахты № 4 рудника Конкола, Замбия
2020-06-11
SCID: 54.1/tbjm92t7
Discuss with AI
numerical modellingore recoverystope wall instabilitysublevel open stopingunplanned dilution
Figures from the paper
Abstract (AI)
Konkola Copper Mine’s Number 4 Shaft is a trackless underground mine applying sublevel open stoping (SLOS) mining method. Number 4 shaft wants to increase ore production from 1 million metric tonnes per annum to 3 million metric tonnes per annum in the next 5 years but ore recovery is 70% or less and dilution is 20% or more. In order to achieve the desired annual target of 3 million metric tonnes ore recovery should be increased from70% to (≥85%) and dilution should be reduced from 20% to (≤10%). Despite being one of the most used underground mining methods, the current SLOS has a challenge of high unplanned dilution. This paper reviews and evaluates parameters that influence recovery and unplanned dilution in sublevel open stopes and applies numerical modelling using PHASE2 software to establish the influence of stress environment on unplanned dilution at the mine. The input parameters for numerical modelling were: Uniaxial Compressive strength (UCS=170MPa), Geological Strength Index (GSI) =55, Young’s Modulus (E) =26000MPa, Hoek-Brown constant (s) =0.0067, Hoek-Brown constant (mi) =20 and Poisson ratio (v) =0.2 major principal stress (σ1) 39MPa, intermediate stress (σ2= 18MPa) and the minor principal stress (σ3= 15MPa). Results obtained from review of mine production records indicate that the main factors that influence unplanned dilution at Number 4 shaft are: poor ground conditions, lack of compliance to recommended stope designs, poor drilling and blasting practices, presence of geological discontinuities, adopted mining sequence of extracting high ore grade first that leads to creation of high stress blocks within the orebody and delayed mucking practice. Results obtained from PHASE 2D model indicate that total displacement of 90mm is recorded in the hangingwall hence influencing stope wall instability that leads to increased unplanned dilution. After stope extraction, it was observed that 60MPa of induced stress developed at the top right corner and 45-50 MPa at the crown pillar and right bottom corner of the stope.
Key Findings
1
After stope extraction, induced stresses reached 60 MPa at the top-right corner and 45–50 MPa in the modelled area, indicating a substantial stress-related dilution risk.
2
Konkola Mine’s Number 4 Shaft records ore recovery of 70% or less and unplanned dilution of 20% or more under sublevel open stoping.
3
PHASE2D numerical modelling indicates 90 mm of hangingwall displacement, contributing to stope-wall instability and increased unplanned dilution.
4
Production records identify poor ground conditions, noncompliance with stope designs, inadequate drilling and blasting, geological discontinuities, mining sequence, and delayed mucking as major dilution factors.
5
The mine must increase recovery to at least 85% and reduce dilution to 10% or less to support production growth from 1 to 3 million tonnes annually.
Research Object
Sublevel open stopes at Number 4 Shaft, Konkola Copper Mine, Zambia
Research Subject
Ore recovery and unplanned dilution, including the influence of ground conditions, stope design, mining practices, geological discontinuities, mining sequence, and stress environment
Publication Details
Publication Date
2020-06-11
Journal
Publisher
ISSN
Cited by
2
Open access PDF
Access Type
Author Information
Download PDF
Subscribe to digest